Coal Handling Upgrade

Southdown, Inc.
Victorville Coal Handling System Upgrade
Victorville, California

Click Image to EnlargeRoberts & Schaefer, as a subcontractor to Duncan Brothers Fabrication & Construction, Inc., completed the design to relocate the Quarry Plant coal handling facility. R&S furnished provided detailed engineering and procurement of mechanical and major electrical equipment. Enhancements to the original design eased the changeover and reduced costs.

The upgrade consists of the following new equipment: two belt feeders, installed under two rail car unloading hoppers, three belt conveyors, and two transfer stations. It includes relocating an existing used hopper and belt feeder, and installation of a stacker/reclaimer, which was not furnished by R&S. Duncan Brothers did all installation work.


© Copyright 2007 Roberts & Schaefer Company. All rights reserved.