Click Image to EnlargeZimmer Power Station
Moscow, Ohio

Under a turnkey contract, Roberts & Schaefer designed, supplied, installed, and commissioned a gypsum handling and barge loading system.

A 600 TPH, 1,014-foot long, 36-inch wide gypsum conveyor is fed either by an existing radial stacker or by front-end loaders into a dozer trap. The gypsum conveyor then transports the material into a moveable-loading chute with a telescoping spout. The chute/spout is designed to fill covered barges through open hatches, which requires that the chute/spout be able to move laterally and extend and retract. A certified belt scale weighs the amount loaded into each barge.

Click Image to EnlargeA new barge haul system positions the barges. R&S constructed a new river cell to support the conveyor structure and the barge haul equipment. A programmable logic controller (PLC) controls the entire operation.