Coal preparation and handling facility
Deane, Kentucky

Scope: Engineering, procurement and construction of
a 750 TPH cleaning plant and handling facility
The 750 TPH plant features raw coal storage and reclaim, a coal
processing plant, refuse conveyor and bin, and a slurry pumping
disposal system. The new raw coal storage consists of a unique
high wall dumping facility with lateral feed of the dump area.
It has guide rails and concrete curbing. A pocket containing a
feeder breaker system is installed at the dump area of the high
wall to crush oversize material coming from some of the local
strip pits. The plant is presently operating in excess of 1,200
TPH.

|