Associated Electric Company

Click Image to EnlargeNew Madrid Power Plant
New Madrid, Missouri

Roberts & Schaefer, in conjunction with EMS-TECH, Inc., provided engineering, procurement, and construction of a vertical-mount stacker at the blending facility for the New Madrid Power Plant.

Click Image to EnlargeThe unit can slew to and from three separate piles, with a total slew angle of 270 degrees. The luffing angle can vary from zero at the horizontal position to minus 15.2 degrees maximum downturn to a maximum 15.2 degrees upturn.

Operation can be manual or automatic and can operate in winds of up to 45 miles per hour. In the automatic mode, which can be operating locally or from the main control panel, the unit develops a continuous slewing kidney-shaped pile. In parking mode, the boom frame is pinned to the support structure for storage during adverse weather conditions. The stacker unit is rated at 4,000 TPH with a 72 inch feed conveyor operating at 830 FPM. Ancillary systems included dust collection, vacuum cleaning, fire protection and washdown collection pumping.