Baltimore Gas & Electric Company

Click Image to EnlargeBrandon Shores, Unit 1 & 2
Anne Arundel County, Maryland

For the two new 620 MW units of the Brandon Shores Power Plant on the Patapso River, Baltimore Gas & Electric Company turned to Roberts & Schaefer for complete project management, detailed engineering, procurement and construction services under a turnkey contract.

This coal handling facility receives coal by 7,000-ton capacity barges requiring extensive marine works including a dock for three barges, jetty way, and a barge hauling system to move barges during unloading. A 4,000 TPH continuous bucket elevator barge unloader was installed on the new jetty way. Assembly of the barge unloader was handled in an innovative way; the entire machine was assembled on the shore and moved in one piece by a floating barge crane.

This project had unique construction challenges due to the seasonal availability of river access and interface restrictions with the power block general contractor.