Wharf Resources
Process Plant Expansion (Metal: Gold)
Deadwood, South Dakota
Complete engineering, procurement, and construction management
were provided to upgrade the existing 2,000 GPM Carbon Adsorption
Plant. The services involved layout and design for the modified
facility including the required pumping systems, carbon handling
and storage, regeneration, acid washing, and modifications to
the existing structures. The work also includes integration of
the existing plant with the new facility electrical system that
provides a PLC control system, a new MCC, and a control room.
|