Project Background

In 2007 Separator R&S was contracted by Kompania Weglowa S.A. to engineer the rebuilding of the KWK Knurow Mine Coal Preparation Plant at the Main Skip Tower.

Project involved increasing the capacity of the flotation circuit, introduction of high speed fine coal dryers and associated equipment - vibratory screens, belt scales, PLC controls, flocculation system, pumps and process piping. New equipment required partial demolition of the reinforced concrete building floors, columns and load bearing members, with immediate replacement with new steel/concrete elements.

All was accomplished with no down time at the plant.