Project Background

Engineering, procurement and construction of the coal handling system ROM Truck Dump to Bunker Tripper.

The plant consisted of 180m3 Truck Dump Hopper, a feeder breaker delivering ROM coal at a rate of 1100 TPH.

The coal is then screened with oversize and tramp being discarded before loading onto a 3km overland conveyor.

The coal is sized through a two stage crushing process and delivered to bunker feed conveyor or the ROM (uncrushed) coal can be directed onto the emergency stockpile.

Coal is reclaimed from emergency stockpile via stockpile reclaimers via bulldozer push to the primary crusher.

The coal is delivered to the bunkers via a tripper conveyor at a rate of 1100 TPH.