Projects

  • Cinergy - Miami Fort Station

Cinergy - Miami Fort Station

Cinergy - Miami Fort Station
  • Owner: Cinergy Services
  • Project: Limestone and Gypsum Handling Systems
  • Location: Miami Fort Station, North Bend, Ohio
  • Scope: Engineering, Procurement and Construction

Project Background

Roberts & Schaefer Company was awarded a turnkey contract from Cinergy Services for a limestone and gypsum material handling system at the Miami Fort Station.

The limestone is received from a barge unloading station and conveyed to a limestone stockout pile at 700 TPH. Limestone is reclaimed with two hoppers and belt feeders to two day bins in the limestone preparation building.

The gypsum is received from the dewatering building vacuum belt feeders. From there it is conveyed at 160 TPH to a stockout pile or an emergency stockpile. Gypsum is reclaimed with a reclaim hopper and belt feeder and conveyed to a barge loadout station.