ROBERTS AND SCHAEFER LOGO
WHO WE ARE
INDUSTRIES SERVED
SERVICES PROVIDED
LITERATURE REQUEST
PROJECT LISTS
by Industry Served
by Service Provided
FTP
PARENT COMPANY
CONTACT US
   
ROBERTS AND SCHAEFER COMPANY - How the world processes its resources


FULL SERVICE ENGINEERING
Scheduling

Project managers frequently face the task of controlling projects with factors that can fluctuate over a wide range. Successful scheduling is the application of engineering principles and techniques of management to achieve a high level of productivity at optimum cost.

Roberts & Schaefer Company plans and controls the construction process so that timetables are met while meeting cost and quality objectives. Two projects that define our exceptional experience are listed below.

SANDUSKY DOCKS CORPORATION
Click for more project information Dust Suppression and Stormwater Management
Sandusky Bay, Ohio

R&S created an automatic dust suppression and stormwater management system to resolve environmental concerns from open piles of coal in ground-level storage. Fugitive dust combined with stormwater runoff created ponds which obstructed operations and might contaminate the bay. In-depth project information

HARRIS MINE - KOPPERSTON PROJECT
Click for more project informationNorfolk & Western Railway Company
Kopperston, West Virginia

R&S served as the project manager and did the detailed engineering, permitting and construction management for this $45 million dollar endeavor. The goal was to create a coal handling system that would combine coal from two separate production facilities, store and load unit trains. Initially capacity was specified as 2 MTPY, but is now running at double that. In-depth project information


Additional Full Service Engineering Scheduling Experience.


© Copyright 2007 Roberts & Schaefer Company. All rights reserved.
Suggestions and feedback are welcome at webmaster@r-s.com.