Environmental compliance and regulatory consulting assistance
is provided during a project's feasibility investigation, during
the permitting phase, including air and water quality, RCRA/HSWA,
wetlands or well development, preparation of an environmental
impact or baseline study, and reclamation planning and design.
The two projects below best represent our experience.
HARRIS MINE - KOPPERSTON PROJECT
Norfolk
& Western Railway Company
Kopperston, West Virginia
R&S served as the project manager and did the detailed engineering,
permitting and construction management for this $45 million dollar
endeavor. The goal was to create a coal handling system that would
combine coal from two separate production facilities, store and
load unit trains. Initially capacity was specified as 2 MTPY,
but is now running at double that. In-depth
project information
FLUID TECH INC.
Waste Stabilization Facility, Utah
For this nuclear waste facility we prepared drawings and specs
for regulatory authorities and reviewed permit applications for
technical accuracy. Special requirements included lined material
handling tanks, dust collection, test lab, and personnel decontamination
facilities. In-depth project information
Additional
Examples of Environmental Compliance and Regulatory Assistance
Experience
|